STATUS OF PERMITS
NO. |
COMPANY NAME |
TITLE OF THE PERMIT |
LOCATION |
DATE ISSUED |
DATE OF EXPIRY |
1 | Genser |
To continue the operation of the 310km onshore Natural Gas Pipeline from Prestea in the western region to Dawusaso in the Ashanti region with its associated lateral lines as part of the Gas Infrastructure project in the Western, Western North, Central, Ashanti Regions |
Prestea to Dawusaso |
23rd August 2023 |
22nd February 2025 |
2 | Genser |
To continue with the construction and installation of infrastructure for 200mmscf/d Gas Liquefaction and Natural Gas Conditioning Plant (GCP) and connecting 20’’ 3.6km gas pipeline and further pipeline in Prestea as per attached schedules |
Prestea |
23rd August 2023 |
22nd February, 2025 |
3 | Genser |
To commenced operation of 110km, 24’’ Natural Gas Pipeline from Gyegyetreso to Anwomeso in the Ashanti Region and its ancillary facilities |
Gyegyetreso to Anwomeso |
8th September, 2023 |
8th January, 2025 |
4 | Tullow (Jubilee) |
To undertake the proposed offshore drilling, completion and FPSO hookup of Two (2) wells (JAX-P/J68-P and JBC-P/J69-P) |
Offshore Jubilee Field |
October 19th, 2023 |
20th October, 2024 |
5 | Tullow (Jubilee) |
To undertake the proposed drilling, completion and hook-up of MG/67-67-WI well to the Jubilee FPSO as per attached schedule. |
Offshore Jubilee Field |
21st July, 2023 |
20th March, 2024 |
6 | Tullow (Jubilee) |
To undertake the proposed Jubilee Riser10 Flowline retrieval and replacement in the Jubilee Field as per attached schedule. |
Offshore Jubilee Field |
29th June, 2023 |
29th December ,2023 |
7 | Tullow (Jubilee) |
To undertake the proposed offshore drilling, completion and FPSO hook-up of JU-P (J66-P) as per as per attached schedule. |
Offshore Jubilee Field |
9th May, 2023 |
8th May. 2024 |
8 | Tullow (Jubilee) |
To undertake the proposed offshore drilling, completion and FPSO hook-up of Two (2) wells (JAX-P/J68-P AND JBC-P/J69-P) as per attached schedule. |
Offshore Jubilee Field |
October 19, 2023 |
October 20, 2024 |
9 | Tullow (Jubilee) |
To continue the operation of Fabrication Yard with offices at Secondi Naval Base |
Sekondi Naval Base |
November 17,2022 |
November 16, 2025 |
10 | Tullow (Jubilee) |
To undertake drilling, completion and FPSO hook-up of Three (3) Wells (JV-WI, MA-P and MF-P) in the Greater Jubilee Development Area as per attached schedule |
Offshore Jubilee Field |
September 22,2022 |
December 31, 2023 |
11 | Tullow (Ten) |
To continue production of hydrocarbons and associated operations in the TEN Fields as per attached schedule. |
Offshore Jubilee Field |
December 18,2020 |
December 31, 2023 |
12 | Tullow (Ten) |
To undertake offshore Drilling, Completion and FPSO HOOK-UP of NTF-WI(NT13-WI) well in the TEN Field |
TEN Field |
May 22,2023 |
May 21,2024 |
13 |
ENI Ghana |
To continue operation of Non-Associated Gas processing on the FPSO, export of gas through offshore and onshore pipelines and the operation of Onshore Receiving Facility at Sanzule in the Ellembelle of the western region as part of the OCTP Phase 2 as the attached schedule |
OCTP Block |
December 21,2022 |
December 20, 2025 |
14 |
ENI Ghana |
To continue hydrocarbon production and associated support activities in the Sankofa Gye Nyame field Offshore Cape Three Point (OCTP) Block (Phase 1) as per attached schedule: |
OCTP Block |
15th May, 2023 |
14th May, 2026 |
15 | AI ENERGY GROUP |
To continue the operation of |
Takoradi Port – Western Region. |
31st March, 2023 |
26th October, 2025 |
16 | WAPCO LTD |
To continue the operation of the Long Dry Gas Pipeline Transmission System (350.4km offshore and 17.9km onshore pipelines) and associated facilities |
Aflao to Takoradi Tema to Takoradi |
August 16,2022 |
May 23, 2025 |
17 | GHANA NATIONAL GAS COMPANY |
To commence the construction and operation of the 600MT LPG bottling plant project |
Axim |
August 9, 2022 |
February 8, 2024 |
18 | GHANA NATIONAL GAS COMPANY |
To undertake the construction and operation of an onshore 2km Gas Pipeline from AKSA Energy to Sentuo Ceramics |
Tema |
August 1,2022 |
January 28,2024 |
19 | TECHNIPFMC GHANA LTD |
To continue the operation of an existing Subsea Production System and Subsea Tree Manufacturing facility |
Takoradi Port |
April 20,2021 |
May 19,2024 |
20 | EXPRO OILFIELDS SERVICES GHANA LTD |
To continue the operation of oil well testing, wireline intervention and subsea intervention Centre at Amanfulkuma |
Amanfulkuma |
April 28,2021 |
March 27, 2024 |
21 | KPONE MARINE SERVICES LTD |
To continue the operation of an existing Bulk Petroleum Transfer/metering station and associated 2500m3 gasoline and 2500m3 diesel petroleum storage tanks, 400m3 interface and 1000m3 water storage facility |
Kpone |
April 22, 2021 |
April 21, 2024 |
22 | GHANA OIL COMPANY LTD |
To continue operating the existing offshore bunkering and onshore petroleum storage in the western region |
Takoradi |
January 22, 2021 |
January 21, 2024 |
23 | GOIL PLC |
To continue operation of the existing Ship-to Ship transfer of marine gas oil (MGO) bunkering activity |
Tema Port |
November 18, 2022 |
November 18, 2025 |
24 | THE CROSS ENERGY LTD |
For the operation of logistics base facility |
Funko |
April 30, 2022 |
April 29, 2025 |
25 | VOLTA RIVER AUTHORITY |
To continue the operation of an existing Natural Gas Pipeline from interconnecting facility near WAPCO Tema R &M Station to VRA Tema Thermal Power Complex, Tema Heavy Industrial Area and Kpone thermal power station. |
Tema and Kpone |
August 17, 2022 |
August 16, 2024 |
26 | BAKER HUGHES ENERGY TECHNOLOGY GHANA LTD |
To continue operation of the offshore engineering, fabrication, subsea equipment texting and other auxiliary services |
Takoradi |
August 17, 2022 |
August 16, 2024 |
27 | OMNI ENERGY LTD |
To continue the operations of the Oily Waste Treatment Facility at Eshian Industrial Area in Sekondi- Tarkoradi Metropolis. |
Eshian |
August 8, 2022 |
February 6, 2024` |
|
HARLEQUIN INTERNATIONAL GHANA LTD |
To continue the operation of an oil pipeline, cleaning, engineering, fabricate on works and pipeline installation facility. |
Ewusiajoe |
February 11, 2022 |
February 10, 2025 |
29 | GOS LTD – A SCHLUMBERGER JOINT VENTURE COMPANY |
To continue operation of a Liquid Mud Plant (Drilling Fluid Services); an Environmental Solution & Well Bore Productivity Workshop and a chemical warehouse |
Takoradi Harbour, Senkondi-Takoradi Metropolis. |
February 10,2023 |
July 3, 2025 |
30 | SENTUO OIL REFINERY LTD |
For the construction and operation of a 4 No, 3.5km pipeline system to carry crude oil and finished product to the Gao Booster Station, and to receive Gas from VRA regulating and metering station to the proposed Sentuo Oil Refinery |
Tema Heavy Industrial Area, Greater Accra. |
February 8,2023 |
July 7, 2024 |
31 | SENTUO OIL REFINERY LTD |
To construct and operate a 3.6km pipeline system to carry crude and finished products from the Ghana Ports and Harbours Authority (GPHA) Oil Jetty to the Sentuo Oil Refinery site. |
Tema Heavy Industrial Area |
June 27, 2023 |
December 27, 2025 |
32 | GOS LTD |
To continue the operation for fabrication, maintenance and servicing of drilling equipment and accessories |
Axim Express Road, Apremdo Industrial Area. |
January 20,2023 |
January 19, 2025 |
33 | GOS LTD |
To continue to operate a cable spooling and stacking yard, a free zone storage area for imported equipment and materials and a gun loading shop |
Apowa Industrial Layout, Kejibril-Apowa Road, Takoradi. |
January 20,2023 |
January 19, 2025 |
34 | HALLIBURTON |
To continue the operation of the Completion Tools Facility along the. Takoradi Agona main road |
Fretsi, |
November 18, 2021 |
October 17, 2024 |
35 | GHANA PETROLEUM MOORING SYSTEM |
To continue operating the Single Point Mooring ,Conventional Bony and the Offshore /Onshore Pipeline Systems Located in the Tema Metropolis of the Greater Accra Region |
Tema |
November 17, 2021 |
November 16,2024 |
36 | ZEAL |
To continue operations of an existing Integrated Waste Management and Offshore Chemical Storage Facility |
Nyankrom Industrial Area |
July 23,2021 |
July 22, 2024 |
37 | ZOIL SERVICES LIMITED |
To continue the operations of an Oil and Hazardous Waste Management Facility |
Nyankrom Industrial Area |
July 23,2021 |
July 22, 2024 |
38 | BLUE OCEAN |
To operating the existing 13.5km Marine Petroleum Pipeline and Storage Facility |
Effia Industrial Area |
August 17, 2021 |
August 16, 2024 |
39 | GHANA NATIONAL PETROLEUM CORPERATION |
To construct a gas distribution system known as the City Gate Gas Facility (GGGF) |
Tema Metropolitan Industrial Enclave of the Greater Accra Region |
July 10, 2023 |
January 09,2025 |